Shipyard Facilities
The development of the shipyard is planned over 3 Phases.
Phase 1 is viable on its own and would include the following facilities and equipment on the 45 hectare site at Limbe :
- South Breakwater of 700 metres length
- Quay of 400 metres for afloat works & Rig floating dock
- Rig Floating dock of 36,000 tonnes lifting capacity
- Floating dock for ships of 10,000 tonnes lifting capacity (To be transported from Douala)
- Workshops for steelworks, pipe works, mechanical and electrical works
- Lifting equipment
- Utilities networks (power, compressed air & industrial gases, fire fighting, freshwater, HP & LP water, communication, lighting)
- Slop and sludge treatment and disposal
- Bunkering
- Office facilities
- Recreation & lodging
An Employee Housing scheme is also planned to be developed on a 75 ha site adjacent to the Limbe shipyard site.
|